Loading job from API…
Building Connected
—
Due
Public project information
Mirrors Building Connected’s left column: number, name, key dates, location, size, design team, then narrative fields.
Description
Trade-specific instructions
Advanced options
Private information
Internal / imported fields (in BC, private fields are visible only to your company on the Information tab).
Invitees / team
Drawings
Same project drawing log as Job workspace when this lead is linked to a project.
Loading drawings…
No project linked — link this opportunity to a project to load drawings and the PDF viewer.
Specifications
Procore-style spec book for the linked project.
No project linked.
RFIs
Project RFI log when a project is linked (same APIs as project detail).
Loading RFIs…
No project linked — RFIs unlock after award / link.
| # | Subject | Status | Ball in court | Assignees | RFI Manager | Due |
|---|