Project notes will appear here when messaging is enabled.

System alerts will appear here when configured.

Team chat is not enabled yet.

Construction — Estimate Detail
Loading job information…

Notes

Drawings

Project drawing log when this estimate is linked to an active project.

Loading drawings…
No project linked — award or link this lead to a project to load drawings.
Specifications

Spec book when a project is linked.

Open full page
No project linked — specs unlock after award / link.
RFI

Project RFI log when this estimate is linked to an active project.

Loading RFIs…
No project linked — award or link this lead to a project to load RFIs.
# Subject Status Ball in court Assignees RFI Manager Due

Open this page with a lead id in the URL (?id=…) to load takeoff lines.

Line items

Tip: scroll horizontally to see all columns; description stays pinned on narrow widths.

Section Cost code Description Type Qty UOM Unit cost Extended Save

Edits save when you leave a row (tab or click away). Set TAKEOFF_API_WRITES_ENABLED=true if POST/PATCH returns 403.

Rollup

Labor (L)$0.00

Material (M)$0.00

Equipment (E)$0.00

Subcontract (S)$0.00

Other (O)$0.00


Subtotal$0.00

Fee (subtotal × fee %)$0.00

Total$0.00

Cost library

    Open this page from the Estimate table with a lead id in the URL.

    RFP

    RFP documents and responses will appear here when this estimate is linked to an RFP workspace.